Aiming at producing low sulfur concentrate and recovering hematite from the tailings of other processing plants, the plan is to build a dry waste recovery line with a production capacity of 350,000 concentrates per year; It built a production capacity of 460,000 tons per year, which was put into operation in November 2010. The factory employs 166 people directly.

Since the start of this production unit, from the very beginning it has been contracted to operate, supply and maintain parts and maintenance with Goharroosh Sirjan Company.